【Product Introduction】
Polymer modified asphalt waterproof coating is modified with styrene-butylstyrene styrene-styrene (SBS) copolymer thermoplastic elastomer modifier to modify the excellent petroleum asphalt, and add a variety of rubber, synthetic resins, surfactants, emulsifiers, antifungal agents and other auxiliary materials, refined by special equipment, ultraviolet resistance and high and low temperature, high elongation of the coating film and super adhesion, good deformation to cracks, and a new type of high-efficiency waterproof coating that combines all the advantages of quick-setting spraying and non-fixed-line coatings.
【Scope of application】
It is mainly used for flooring, industrial and civil building roof and side wall waterproofing projects; planting roof waterproofing works; waterproofing works such as underground structures, subway stations, tunnels, etc.; waterproof projects such as roads, bridges, railways, etc.; waterproofing projects such as dams and water conservancy facilities;
【Product Advantages】
● Excellent performance: good cold resistance, heat resistance, corrosion resistance, and strong adhesion;
Convenient construction: The product is a water emulsion material, which can be applied on a variety of irregular shape substrates. Cold construction, short construction period;
Strong adhesion: it can be constructed on the surface of damp waterless concrete, asbestos board, various metals, wood, plastics, etc., and can be used in combination with other waterproof materials;
Convenient maintenance: local damage and leakage, local maintenance thickness can be directly used for caulking sealing, and can also be used for metal anti-corrosion;
【Construction technology】
● Base treatment: The surface of the base should be smooth, solid, clean, no sharp corners, no oil stains, no water and cracks;
2. Detail treatment: embed and fill the sealing material according to the design requirements in the remaining groove (rapid plugging king); Before construction, the yin and yang angles and pipe roots are processed into arcs or obtuse angles, covered with mesh cloth, and painted in multiple ways;
3. Large-scale brushing, first wet the base layer saturated but without water, use a brush to brush the waterproof coating on the treated substrate, according to the use (interval of more than 2-4 hours) can carry out the next process, the next painting direction should be perpendicular to the upper direction (90 °) to achieve full coating;
4. Closed water test: after the coating film is completely dry, block the sewer for water storage, the water storage depth should not be less than 20mm, the water storage time is 24 hours, and the water surface does not drop significantly to be qualified